(6.6 hours) Began re-building door panel and handle hardware for the smaller walk-in door. This door will eventually have a removable vent/filter for the paint booth.
(3.0 hours) Installed weatherstripping around large, folding hangar door. Stripped and painted around old walk-in door. Measured both walk-in doors for insulation. Installed secondary power junction box.